A new residential area is not connectable to the mains and thus requires the installation of 60 PE decentralized treatment plant.

Capacity

60 PE

Client

Demeures Drômoises

Installer

Charignon  Installations

Technical description

Technical specificities: Use of electricity for sewage pumps upstream of the system. No use of electricity for the processing phase. 15 meters of soil infiltration drains were recommended by the SPANC (local authorities) downstream of the system.

Norite su mumis susisiekti?

Sveiki, mano vardas José Manuel Rodríguez , BIOROCK International Sales Director . Susisiekite su mumis dabar ir gaukite NEMOKAMĄ projekto įvertinimą.

Kur esate?

Apie jus?

Susisiekti su jumis

Telefono prefiksas automatiškai nustatomas pasirinkus šalį.

Kokio tipo produktas jus domina?

Jei pasirinksite kitą, nurodykite pastabų laukelyje.

Kaip galime jums padėti?